Five live feeds at five different rates, reconciled onto one clock.

464stations239vehicles
Megacity Transit Optimisation Platform — live interface

Captured from the running product. transitoptimizer.terranexamaps.com

Subway telemetry arrives every 10 seconds, PATH every 15, bus CAD/AVL every 30, ferry AIS every 45 and commuter-rail block occupancy every 60 — roughly 1,040 records a minute. All five are snapped onto one ten-minute decision clock with explicit staleness accounting, so a decision is never made on a feed that has quietly gone quiet.

When a surge pushes platform load past the 92% target, the engine prices the timetable change: interval, extra departures, rolling stock, riders absorbed and cost per hour. When the cause is degraded track rather than demand, it proposes load diversion and street bridging instead — because more trains cannot pass a failed interlocking.

What is actually running

  • Five feeds at five different rates reconciled onto one 10-minute decision clock, with staleness accounting.
  • Demand measured against service in the same units across 464 stations, so load factor reflects throughput.
  • Dynamic headway adjustment prices a timetable change when load passes the 92% target.
  • Correct response chosen by cause: timetable change for demand surges, diversion and street bridging for track faults.

Built with

Five live feedsDynamic headwaysShock simulation

Open the live product